ModusComplete carried out the renovation works for the handling of radionuclides and preparation of radiopharmaceuticals at IPO Porto, in a total area of 21m2, including the installation of a Class D Cleanroom and its respective airlock.
The room is intended for the manipulation of radionuclides and radiopharmaceuticals, and therefore, it was equipped with a specific air conditioning system. It was a turnkey project, including all specialties such as civil construction, electricity, and HVAC. In terms of materials, it was ensured that the rooms were constructed with easily washable materials and a high degree of asepsis, both in terms of walls, floors, and ceilings.











