Project Title: MODUSCOMPLETE ADAPT Project Code: NORTH-02-08B9-FEDER-069003 Main Objective: Strengthening the competitiveness of small and medium-sized enterprises Intervention Region: North Beneficiary Entity: MODUSCOMPLETE, LDA Approval Date: 07/06/2020 Start Date: 07/07/2020 End Date: 03/31/2021 Total Eligible Cost: 39,848.48 Euros European Union Financial Support: 19,924.24 Euros ERDF Objectives, Activities, and Expected/Achieved Results: The…
Project Title: MC – Expands & Modernizes Project Code: NORTE-06-38D7-FEDER-001188 Main Objective: To stimulate national production Intervention Region: North Beneficiary Entity: MODUSCOMPLETE, LDA. Approval Date: 2022-01-25 Start Date: 2021-07-01 End Date: 2022-06-30 Total Eligible Cost: 234,985.00 Euros Financial Support from the…
Modus Complete, in partnership with the Port Wine Institute, has developed wine tasting tables. These tables feature LED lighting and movable panels, allowing for detailed observation of the wine. They can also be transformed and adapted into workbenches. The tasting booths…
The new Intensive Care Unit (ICU) at the Centro Hospitalar de Gaia/Espinho opened in December 2020. Covering 1,650 square meters, the ICU was built in 90 days and features 28 beds, including six isolation rooms. Modus Complete was part of this…
IPO Coimbra has been equipped with a Biosafety Level 2 (BSL-2) laboratory, thus reconfiguring the laboratory response for adequate and rapid COVID-19 diagnosis. The design, lab planning, and construction of the laboratory were carried out considering the specificity and technical-scientific rigor…
ModusComplete carried out the renovation works for the handling of radionuclides and preparation of radiopharmaceuticals at IPO Porto, in a total area of 21m2, including the installation of a Class D Cleanroom and its respective airlock. The room is intended for…